Skip to documentation content
On this page
  1. Location
  2. Using the value

Control positive node

Control positive node controls the corresponding value for VCVS.

Control positive node controls the corresponding value for VCVS.

Location

VCVS → Control positive node

Initial value: 1.

Using the value

Select VCVS and review this setting before its next build, solve or evaluation.

If an expression is rejected, check its units, spelling and scope. Do not substitute a result from an unrelated study.

Control positive node — Telion 0.1.0-alpha | Telion